EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
wstoelting
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (396)
Research
- (3)
Workshop
- (3)
Empennage
Fuselage
- (74)
Firewall
- (1)
Tail Feathers
- (5)
Wings
- (135)
Controls
- (7)
Avionics
- (8)
Lighting
- (2)
Instrument Panel
- (13)
Landing Gear
- (19)
Engine
- (41)
Propeller
- (5)
Fuel System
- (30)
-
Fuel Return Line
-
Firesleeve and Fitting
-
Fuel Lines to Firewall
-
Fuel Bulkhead Fittings
-
Fuel Line Reroute
-
Support for Fuel...
-
Fuel Shutoff
-
Vent Line, Filter,...
-
Metal Fuel Routing,...
-
Fuel Line Mounting...
-
Installed Fuel Line...
-
Fuel Line, Thread...
-
Fuel Fittings and...
-
Painted Header Tank
-
Fuel Fittings/Filter
-
Fuel Line, Return
-
Fuel Pump
-
Fuel Line
-
Header Tank
-
Aluminum Fuel Line...
-
Shutoff Valves
-
Aluminum Header Tank
-
Nav/Position/Strobe...
-
Fuel Pumps
-
Left Wing Fuel Tank...
-
Tapped Sight Gauge...
-
Header Tank Fabricate
-
Header Tank...
-
Header Tank Pattern
-
Header Tank
Interior Finish
- (8)
Paint / Decals
- (22)
Inspection
- (2)
Tools
- (18)
Builder Name:
Wade Stoelting
-
Project:
Just - Highlander
-
VIEW REPORTS
Total Hours:
799.9
Total Flight Time:
Total Expense:
$70783.69
Start/Last Date:
Oct 09, 2019 - No Finish Date
Engine:
Yamaha Apex
Friendly URL:
https://eaabuilderslog.org?s=wstoelting
Home or Last Project Picture
Dec 21, 2020
Shutoff Valves
Category: Fuel System
Wing tank shutoff valves 6AN male fittings.
20201219_124613.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.